/
/
Add the Procore project stages NetSuite already uses
For operations admins who want missing Procore project stages created from NetSuite project statuses by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
A new NetSuite status needs a matching Procore stage
When NetSuite starts using a new project status, an admin has to add a matching stage in Procore by hand. If it is missed or spelled differently, the two lifecycles drift and portfolio reports disagree.
Without PopdockAI
- Review the statuses in use on NetSuite projects
- Open the Procore project stages and compare by eye
- Key each missing stage with a category
- Check the stage list again to see what landed
With PopdockAI
- Statuses and stages are compared by name for you
- Categories come only from values already in Procore
- You confirm the exact list before any stage is created
- Created stages are read back, and nothing is renamed or deleted
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** Find NetSuite project statuses that have no Procore project stage, show the proposed new stages, and after explicit confirmation create them in Procore. Limit the proposal to the status {status} if it is set, and use category {category} for the new stages if it is set.
**Step 1: Read the Procore stages (procore-company-admin server)**
Call `procore-get-project-stages`. Keep every stage name and category. Note the category values already in use.
**Step 2: Read the NetSuite statuses (netsuite server)**
Call `netsuite-get-project` with `max-records` of 500, passing {status} as `status` if it is set. Collect the distinct status values.
**Step 3: Propose**
A status already has a stage if a stage name equals it ignoring case and punctuation. For each status without one, propose a new stage with that status as the name. Choose a category only from the values already returned in Step 1, or use {category} if set. If you cannot choose a category confidently, say so. Show the list and ask the user to confirm it. Stop here until the user answers yes.
**Step 4: Create (only after confirmation)**
For each confirmed stage, call `procore-create-project-stage` (procore-company-admin server) with the proposed name as `name`, the category as `category` and `is-bidding-stage` as false unless the user said otherwise. Then call `procore-get-project-stages` again to confirm each stage now exists.
**Step 5: Report**
List the stages created with their ids, the ones skipped and why, and any that failed with the error.
**Rules & Guidelines:**
* `procore-get-project-stages` and `procore-create-project-stage` are on the procore-company-admin server; `netsuite-get-project` is on the netsuite server.
* `procore-create-project-stage` is the only tool allowed to write. Do not call any other `procore-create-*`, `procore-update-*` or `procore-delete-*` tool, and do not call any of the `netsuite-add-*` and `netsuite-update-*` tools.
* Never create a stage before the user confirms the exact list.
* Never create a stage whose name already exists.
**Validation:**
* If every status already has a stage, say nothing needs creating and stop.
* If the create tool is not available (inactive), say so and give the list for manual entry.
* Never delete or rename an existing stage.Who it's for
One answer, three teams that use it
Procore administrators
Add stages without hand keying
Create stages for new NetSuite statuses in one confirmed batch instead of adding them one at a time.
Find NetSuite project statuses with no Procore stage and propose them with categories.
Project controls leads
Keep lifecycles lined up
Bring Procore stages in step with the statuses NetSuite projects use, so portfolio reports agree across both systems.
Does Procore have a stage for the On Hold status that NetSuite projects use?
Finance systems analysts
Close the gap after a NetSuite change
After a status change in NetSuite, check what Procore is missing and add it once you have reviewed the list.
Compare NetSuite statuses with Procore stages and add the missing ones in the Active category.
How it works
What PopdockAI does when you ask
You ask in plain words. Your AI assistant compares NetSuite statuses with Procore stages and creates stages only after you have confirmed the exact list.
Ask
You ask for missing stages, optionally for one status or a category.
Compare
It reads the Procore stages and NetSuite statuses and finds the statuses with no stage.
Confirm
You see the proposed stage names and categories and confirm the exact list.
Create
It creates each confirmed stage, reads the stages again, and reports created, skipped and failed.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-project-stages
netsuite-get-project
procore-create-project-stage
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
Procore stages that match NetSuite statuses
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)
