Connectors

/

Procore

/

Analyze Procore proposal cost breakdown
Report

See where a Procore bid total comes from

For estimators and finance leads who want a proposal's cost ranked by group and item, by asking their AI assistant.

Try PopdockAI free
Get a live demo
Analyze Procore proposal cost breakdown
Break down the Base Bid proposal on the Riverside Tower bid board project and show me where the money sits.
Base Bid on Riverside Tower totals 4,820,000, and three groups carry 71 percent of it. - Structure: 1,640,000 (34 percent) - Mechanical and electrical: 1,150,000 (24 percent) - Facade: 630,000 (13 percent) - Flags: 2 groups have no labor cost and 6 items have zero cost Want the full ranking of all 14 groups and the top ten items?
Procore
Sample figures. Your results come from your own account.
procore-get-estimating-bid-board-projects
procore-get-estimating-bid-board-projects-proposals
procore-get-estimating-bid-board-projects-proposals-line-item-gr
procore-get-estimating-bid-board-projects-proposals-line-items

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

A bid total hides what drives it

Understanding a bid board proposal means opening each line item group and adding cost and labor by hand. The big drivers get missed, and zero-cost lines hide in the detail.

Without PopdockAI

  • Open each line item group on the proposal
  • Add up item cost and labor in a spreadsheet
  • Sort the line items to find the expensive ones
  • Miss the lines that carry no cost

With PopdockAI

  • Groups and items are read for you in one request
  • Groups are ranked with each share of the proposal total
  • The ten most expensive items are listed
  • Zero-cost lines are flagged and only returned figures are shown

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Break down the cost of the proposal "{proposal-name}" (all proposals if empty) on the bid board project "{project-name}" and show where the money sits.

**Step 1: Resolve the project and proposals**

Call `procore-get-estimating-bid-board-projects` with `name.contains` set to {project-name}. If it matches more than one project, list them and stop. Then call `procore-get-estimating-bid-board-projects-proposals` with `bid-board-project-name` set to the matched name, adding `name` when {proposal-name} is not empty.

**Step 2: Read the cost structure**

For each proposal:

* Call `procore-get-estimating-bid-board-projects-proposals-line-item-gr` with `bid-board-project-name` and read `item-cost` and `labor-cost` per group.
* Call `procore-get-estimating-bid-board-projects-proposals-line-items` with `bid-board-project-name` for the individual items, then keep the rows whose `proposal-name` matches the proposal.

**Step 3: Analyse**

* Rank groups by `item-cost` and give each group's share of the proposal total.
* List the ten most expensive line items.
* Flag groups with labor cost of zero and items with a cost of zero.
* If there are several proposals, show the totals side by side and name the primary one if the data says which it is.

**Step 4: Report**

Proposal total, a group table, the top ten items, then flags. Keep it to the numbers returned.

**Rules & Guidelines:**

* This prompt is read-only. Never call any `procore-create-`, `procore-update-`, `procore-delete-`, `procore-clone-`, `procore-move-` or `procore-import-` tool.
* Report only values the tools returned. Do not guess a total, status or date that a read did not return.

**Validation:**

* If a proposal has no line items, say the proposal is empty rather than showing a zero breakdown.
* If the proposal name matches more than one proposal, analyse all of them and say so.

Who it's for

One answer, three teams that use it

Estimators

Check the build up of a proposal

See which groups and items drive the number before the proposal goes out, without adding anything up.

Break down all proposals on the Contoso Warehouse bid board project and show the top ten line items.

Finance leads

Review bid cost and labor

Spot groups with no labor cost and items with no cost, which point at gaps in the estimate.

On Northwind Plaza, which line item groups in the Alternate 2 proposal have no labor cost?

Preconstruction directors

Compare proposals side by side

See totals for each proposal on a project, and which one the data names as primary, ahead of a bid review.

Compare the proposals on Fabrikam Depot and show where the money sits in each.

How it works

What PopdockAI does when you ask

You name the bid board project and, if you want, one proposal. Your AI assistant reads the cost structure and reports it. It is read-only and shows only figures Procore returned.

Ask

You name the bid board project and optionally one proposal.

Your AI tool

Resolve

It finds the project, stops if the name is ambiguous, and picks up the proposals.

procore-get-estimating-bid-board-projects
procore-get-estimating-bid-board-projects-proposals
procore-get-estimating-bid-board-projects-proposals-line-item-gr
procore-get-estimating-bid-board-projects-proposals-line-items

Read

It reads each proposal's line item groups and line items with their cost and labor figures.

No items found.

Report

It gives the total, groups ranked by share, the top ten items and the zero-cost flags.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-estimating-bid-board-projects

Returns Procore Preconstruction bid board projects, with status and the assigned estimator.
get-data

procore-get-estimating-bid-board-projects-proposals

Returns the estimating proposals on Procore bid board projects, with their totals and status. Used to see how much work a customer has bid.
get-data

procore-get-estimating-bid-board-projects-proposals-line-item-gr

Returns Procore bid board project proposal line item groups from the Procore connector. Read-only.
get-data

procore-get-estimating-bid-board-projects-proposals-line-items

Returns Procore bid board project proposal line items from the Procore connector. Read-only.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

Know what drives the bid before the review meeting

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation