Connectors

/

Procore

/

Audit Procore field production data quality
Report

Find the field production rows that distort your rates

For analysts and project controls teams who ask their AI assistant to check a Procore project's field production report for rows that look wrong.

Try PopdockAI free
Get a live demo
Audit Procore field production data quality
Audit the field production report for Riverside Tower and check the first 300 rows.
Riverside Tower: 41 of 300 field production rows fail at least one check, and 259 are clean. - Missing or zero budget: 9 rows - Hours logged with zero quantity: 14 rows - Percent complete over 100: 6 rows - Blank unit of measure or sub-job: 12 rows Want the failing rows listed with cost code and sub-job?
Procore
Sample figures. Your results come from your own account.
procore-get-field-production-report

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Bad rows quietly skew your production rates

A field production report is checked by eye, one row at a time. Zero budgets, hours with no quantity and percentages over 100 sit unnoticed and pull rates and forecasts off until someone spots them.

Without PopdockAI

  • Scroll the report row by row looking for odd numbers
  • Spot zero budgets and hours with no quantity by eye
  • Work out which rows break the percent complete logic
  • Find out the rates were wrong after they were used

With PopdockAI

  • Every row is tested against the same five checks
  • You get a count per check and the exact failing rows
  • Blank or zero values are noted, never divided by
  • Nothing in Procore is changed, and clean rows are counted

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Audit the field production report for {project-name} for rows that look wrong, so the numbers can be trusted, looking at up to {max-results} rows (default 200).

**Step 1: Pull the rows**

Call procore-get-field-production-report with project-name set to {project-name} and max-records set to {max-results}.

**Step 2: Apply the checks**

* Budgeted hours or quantity missing or zero.
* Actual hours above zero with actual quantity of zero (work with no output recorded).
* percent-complete above 100, or earned-hours above udgeted-hours.
* emaining-hours plus ctual-hours far from projected-hours-at-completion.
* Blank unit-of-measure or sub-job-name.

**Step 3: Report**

A count per check, then a list of offending rows with cost-code, sub-job-name and the specific problem. Say how many rows were clean.

**Rules & Guidelines:**

* This is a read-only job. procore-get-field-production-report is the only tool; never attempt to change any Procore record.
* Quote figures exactly as returned; do not invent hours or quantities that are not in the rows.

**Validation:**

* If the read returns no rows, say so, list the filters used, and suggest loosening them.
* If a field is blank or zero (for example budgeted hours of 0), note it and exclude it from ratios instead of dividing by it.

Who it's for

One answer, three teams that use it

Project controls

Clean data before the forecast runs

Check a project's production rows before you build rates from them, so one bad budget does not bend the forecast.

Audit the Fabrikam Depot field production report, up to 200 rows, and show me anything with hours but no quantity.

Estimators

Validate history before it prices the next bid

Make sure the production figures you reuse for pricing are not carrying zero budgets or impossible percentages.

Run a data quality check on the Contoso Warehouse field production rows and tell me how many were clean.

Operations analysts

Spot recording habits that need fixing

See which cost codes and sub-jobs keep failing the checks, so you can ask the crews who record them to fix it.

Which cost codes on Northwind Plaza have percent complete over 100 or earned hours above budgeted hours?

How it works

What PopdockAI does when you ask

You name the project and your AI assistant reads its field production report and tests each row. It reports problems and counts the clean rows, and it never edits the report.

Ask

You name the project and, if you like, how many rows to look at.

Your AI tool

Pull

It reads the project's field production report up to that row limit.

procore-get-field-production-report

Check

It tests each row for missing budgets, hours with no output, impossible percentages and blank units.

No items found.

Report

You get a count per check, the failing rows with cost code and sub-job, and the clean row count.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-field-production-report

Returns Procore Helix field production report summary rows: budgeted versus actual hours, quantities and production rates by project and cost code. Filter by project. The tool is built Inactive until switched on.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

Trust the numbers behind your production rates

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation