/
/
Find bid board projects whose estimator is no longer active
For estimating leads and operations managers who want to know every bid board project has an active estimator, by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
Bids sit with estimators who have already left
The bid board names an estimator, but only the company directory says whether that person is still active. Work sits with deactivated users until a deadline gets close.
Without PopdockAI
- Open each bid board project and note the estimator
- Look each person up in the company directory
- Check the inactive users for the ones you cannot find
- Add up each estimator's workload by hand
With PopdockAI
- Open bid board projects are read in one pass
- Each estimator is checked as active, inactive or unknown
- Workload and earliest due date are shown per estimator
- Gaps are listed for you to reassign, never decided for you
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** For bid board projects with status {status} (default: all open statuses), confirm each assigned estimator is an active Procore user and show the estimating workload per estimator.
**Step 1: Read the bid board (procore-preconstruction)**
Call `procore-get-estimating-bid-board-projects`, passing `status` as {status} when it is not empty. Collect `name`, `status`, `due-date`, `stats-total` and `estimator-user-id`. When {status} is empty, exclude statuses that are clearly closed (for example accepted, lost or complete). If nothing is returned, say so and stop.
**Step 2: Look up each estimator (procore-core)**
For each distinct non-empty `estimator-user-id`, call `procore-get-users` with `user-id` set to that value. Note `name`, `active`, `email-address`, `job-title` and `permission-template`. If no user comes back, call `procore-get-users-inactive` with `user-id`. If still nothing, record the estimator as "not found in company directory".
**Step 3: Report**
Return one section per estimator: name, active or inactive, job title, number of open bid board projects, total of `stats-total`, and the earliest due date. Then a separate list headed "Needs reassignment" for projects with no estimator, an inactive estimator or an unknown estimator, showing project name, status and due date.
**Rules & Guidelines:**
* `procore-get-estimating-bid-board-projects` is on procore-preconstruction. `procore-get-users` and `procore-get-users-inactive` are on procore-core.
* The join is `estimator-user-id` from the bid board into the `user-id` parameter of the user tools.
* Both servers are read-only for this job. Do not call any create, update, delete or sync tool on either server.
**Validation:**
* Do not guess a replacement estimator. Only report the gap.
* If a bid board project has no estimator, list it under "Needs reassignment" rather than skipping it.Who it's for
One answer, three teams that use it
Estimating managers
See who is carrying the bid load
Get every estimator's open bids, total value and earliest due date in one view, with anyone inactive marked.
Show open bid board projects per estimator with the total value and earliest due date.
Operations leads
Catch gaps after a staff change
After someone leaves, find the bid board projects still assigned to them so they can be handed on before the next due date.
Which bid board projects are assigned to deactivated users in Procore?
Preconstruction coordinators
Find unassigned bids
List projects with no estimator or an unknown one so nothing in the pipeline is quietly owned by nobody.
Which Procore bid board projects have no estimator assigned yet?
How it works
What PopdockAI does when you ask
You ask for the check. Your AI assistant matches bid board estimators against the user directory and reports the gaps, without choosing a replacement for anyone.
Ask
You give a bid board status, or leave it open for all open statuses.
Read
It reads the bid board projects with due dates, totals and assigned estimators.
Look up
It checks each estimator in the company directory, active and inactive.
Report
You get workload per estimator and a list of projects needing reassignment.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-estimating-bid-board-projects
procore-get-users
procore-get-users-inactive
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
No bid left with an estimator who is gone
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)
