Connectors

/

Procore

/

Compare Procore catalog costs with Intacct items
Report
Cross-Connector

Find stale Procore catalog prices before the bid goes out

For finance teams who want catalog unit costs compared with Intacct standard costs, just by asking their AI assistant.

Try PopdockAI free
Get a live demo
Compare Procore catalog costs with Intacct items
Compare the unit costs in our Concrete and Rebar catalog in Procore with the Intacct standard costs, and flag anything more than 10 percent apart.
Of 42 items in the Concrete and Rebar catalog, 5 are over the 10 percent tolerance. - Largest gap: Rebar #5 grade 60, Procore 0.86 per lb, Intacct 0.71, 21 percent over - Unit mismatch: Wire mesh 6x6, Procore per sheet, Intacct per roll, not compared - Missing from Intacct: 3 items - No standard cost in Intacct: 2 items, percentage skipped Want the full table of all 42 items?
Procore
Sample figures. Your results come from your own account.
procore-get-estimating-catalogs-items
sage-intacct-get-item

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Estimates are priced from costs the ledger no longer agrees with

Catalog unit costs in Procore and standard costs in Intacct are maintained separately. Checking them item by item is slow, so bids go out on prices that drifted away from the ledger.

Without PopdockAI

  • Export the catalog items from Procore
  • Look up each item's standard cost in Intacct
  • Check the unit of measure matches before comparing
  • Calculate the percent difference for every row

With PopdockAI

  • Catalog items are read and matched to Intacct items for you
  • Differences over your tolerance are flagged, largest first
  • Items with different units are marked unit mismatch, not compared
  • Nothing in a catalog or an item is updated

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** For items in the Procore estimating catalog `{catalog-name}`, compare unit cost with the standard cost of the same item in Intacct, flagging differences over `{tolerance-percent}` percent (default 10).

**Step 1: Read the catalog items (Procore)**

Call `procore-get-estimating-catalogs-items` with `catalog-name.contains` set to `{catalog-name}`. If `{item-name}` is given, also filter by `name.contains`. Keep `name`, `catalog-number`, `unit`, `unit-cost` and `unit-labor-cost`. Limit to 50 items and say if the catalog has more.

**Step 2: Find each item in Intacct**

For each item call `intacct-get-item` with `item-id` set to the catalog-number when it is present; otherwise call it with `item-name` set to the item name, then `item-name.contains`. Keep `item-id`, `item-name`, `unit-of-measure`, `standard-cost`, `base-price` and `status`.

**Step 3: Report**

Return a table: item, how it was matched (catalog number or name), Procore `unit-cost`, Intacct `standard-cost`, percent difference, units of measure if they differ, and a verdict (Within tolerance, Over tolerance, Missing from Intacct, Inactive in Intacct). Put Over tolerance first.

**Rules & Guidelines:**

* Tools whose names start with procore are on the procore-preconstruction server. Tools whose names start with intacct are on the intacct server. Both servers must be connected.
* This prompt is read-only. Do not call any write tool, including `procore-create-bid-board-project`, `procore-update-bid-board-project`, `procore-delete-bid-board-project`, `procore-create-estimating-bid-board-projects-notes`, `procore-create-estimating-bid-board-projects-tasks`, `procore-create-cost-item` (Procore) or `intacct-create-customer`, `intacct-update-customer`, `intacct-create-vendor`, `intacct-update-vendor`, `intacct-create-project`, `intacct-update-project`, `intacct-create-journal-entry` (Intacct).
* Report only what the connected users can see; do not guess at records you did not read.
* Do not compare costs when the units of measure differ; report "unit mismatch" instead.

**Validation:**

* If `standard-cost` is empty or zero, report "no standard cost in Intacct" and skip the percentage.
* If the catalog returns nothing, say the catalog name may not match and stop.

Who it's for

One answer, three teams that use it

Estimators

Price from current costs

See which catalog items have drifted from the ledger before you build the next estimate on them.

Compare the Electrical catalog unit costs in Procore with Intacct standard costs, tolerance 5 percent.

Cost accountants

Keep standard costs and catalogs aligned

Find items missing from Intacct or without a standard cost, and items where the units of measure differ.

Which items in the Concrete and Rebar catalog have no standard cost in Intacct?

Purchasing managers

Check supplier price changes reached both systems

Spot items where a price update landed in one system but not the other, ranked by the size of the gap.

Compare the Fabrikam Plumbing catalog items matching copper with Intacct standard costs and show the biggest differences.

How it works

What PopdockAI does when you ask

You name the catalog and set a tolerance. Your AI assistant reads both systems and compares item by item, and changes no price anywhere.

Ask

You give the catalog, and optionally an item name and a tolerance percent.

Your AI tool

Read catalog

It reads the catalog items from Procore with their units and unit costs.

procore-get-estimating-catalogs-items
sage-intacct-get-item

Find items

It finds each item in Intacct by catalog number or name and reads its standard cost.

No items found.

Report

A table shows the difference and a verdict per item, with differences over tolerance first.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-estimating-catalogs-items

Returns the cost items in a Procore estimating catalog, with unit of measure and unit cost. Used to compare catalog prices with other systems.
get-data

sage-intacct-get-item

Returns items from Sage Intacct.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

Bid on prices the ledger agrees with

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation