Compare Procore production rates across projects
Report

Compare crew production rates on one cost code across jobs

For operations leads and estimators who want to compare budgeted and actual production rates for a cost code across projects, asking their AI assistant.

Try PopdockAI free
Get a live demo
Compare Procore production rates across projects
Compare production rates for cost code 03-300 across all projects.
Production on 03-300 ranges from 12 percent faster to 38 percent slower than budget across 6 projects. - Slowest: Riverside Tower, ratio 1.38, 71 percent complete - Fastest: Fabrikam Depot, ratio 0.88, 90 percent complete - Rate based on little completed work: Northwind Plaza, 4 percent complete - Skipped for zero quantity: Contoso Warehouse Want the budgeted and actual rate for every project?
Procore
Sample figures. Your results come from your own account.
procore-get-field-production-report

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Productivity comparisons end up in spreadsheet formulas

To compare crew productivity on the same work across jobs you export reports and build rate maths by hand. Zero quantities break the formulas, and a rate based on very little work looks like a trend.

Without PopdockAI

  • Export the field production report for the cost code
  • Divide hours by quantity for budgeted and actual
  • Work around rows with zero quantity
  • Rank the jobs and guess which numbers to trust

With PopdockAI

  • Rows for the cost code are read across projects
  • Budgeted and actual rates are worked out with the unit stated
  • Zero quantity rows are skipped and listed
  • Projects are ranked, with thin data flagged

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Compare how productivity on cost code {cost-code} differs across projects, optionally limited to projects whose name contains {project-name-contains}.

**Step 1: Pull the rows**

Call procore-get-field-production-report with cost-code set to {cost-code}. If {project-name-contains} is given, pass it as project-name.contains. If {company} is given, pass it as company.

**Step 2: Work out rates**

* Budgeted rate is udgeted-hours divided by udgeted-quantity; actual rate is ctual-hours divided by ctual-quantity. State the unit-of-measure.
* Skip rows with zero quantity and list them separately.
* Ratio of actual rate to budgeted rate above 1 means slower than planned.

**Step 3: Report**

A table by project-name with budgeted rate, actual rate, ratio and percent-complete, sorted slowest first. Add a short note on the spread between best and worst projects and which rates are based on little completed work.

**Rules & Guidelines:**

* This is a read-only job. procore-get-field-production-report is the only tool; never attempt to change any Procore record.
* Quote figures exactly as returned; do not invent hours or quantities that are not in the rows.

**Validation:**

* If the read returns no rows, say so, list the filters used, and suggest loosening them.
* If a field is blank or zero (for example budgeted hours of 0), note it and exclude it from ratios instead of dividing by it.

Who it's for

One answer, three teams that use it

Operations managers

See which crews are slow

Rank projects by how far actual production is from budget on a cost code, so support goes where the gap is largest.

Which projects are slowest against budget on cost code 05-120?

Estimators

Update your rates with real data

Check how actual production compares with budget on completed work, before you price the next bid on the same cost code.

Show budgeted and actual production rates for cost code 09-250 across our projects.

Project controls analysts

Trust the numbers you report

Find the rates built on little completed work so they are not mistaken for performance in the monthly report.

For cost code 03-300, which projects have a rate based on less than 10 percent complete?

How it works

What PopdockAI does when you ask

You name the cost code. Your AI assistant works out the rates from the field production rows and ranks the projects, and never changes a record.

Ask

You give a cost code, and optionally part of a project name or a company.

Your AI tool

Read

It reads the field production rows for that cost code across projects.

procore-get-field-production-report

Calculate

It works out budgeted and actual rates and their ratio, skipping rows with no quantity.

No items found.

Report

You get a table by project, slowest first, with a note on the spread and weak rates.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-field-production-report

Returns Procore Helix field production report summary rows: budgeted versus actual hours, quantities and production rates by project and cost code. Filter by project. The tool is built Inactive until switched on.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

A fair comparison of the same work on every job

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation