Reschedule a Procore bid package
Write

Move a Procore bid deadline without re-keying the package

For preconstruction teams who want a bid package due date changed, with everything else left alone, just by asking.

Try PopdockAI free
Get a live demo
Reschedule a Procore bid package
Move the Structural Steel bid package on Riverside Tower to a due date of 3 December 2026.
One package matches Structural Steel on Riverside Tower, and 3 bids are already in. - Current due date: 20 Nov 2026, 12 invites sent - New due date: 3 Dec 2026, a later date - Carried over: package title and email message, unchanged - Warning: 3 bidders have already submitted Shall I change the due date?
Procore
Sample figures. Your results come from your own account.
procore-get-bid-packages
procore-get-estimating-bid-board-projects
procore-update-bid-package

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Extending a bid deadline risks blanking fields

Moving a bid due date means re-entering package details, and one field left empty can be sent as blank. Bidders who have already submitted may not expect the date to move.

Without PopdockAI

  • Find the package and open its settings
  • Re-enter the title and the messages that must go with the date
  • Check how many bids are already in
  • Send the change and hope no field was blanked

With PopdockAI

  • The package is found, and several matches are listed instead of guessed
  • Title and messages are carried over, never sent blank
  • Bids already received are shown with a warning
  • You confirm, only the due date changes and the stored date is read back

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Move the bid package "{package-title}" (project "{project-name}" if given) to the new due date {new-due-date}, leaving everything else unchanged.

**Step 1: Find the package**

Call `procore-get-bid-packages` with `title.contains` set to {package-title}. If {project-name} is given, resolve its project id with `procore-get-estimating-bid-board-projects` (`project-id`) and filter on `project-id`. If more than one package remains, list them (number, title, project, due date) and stop.

**Step 2: Collect the values to carry over**

The update tool needs the title, the web message and the email message as well as the due date. Read the package's `title` and `formatted-bid-email-message` from Step 1. If the web message was not returned, tell the user it must be supplied and wait. Never send a blank message.

**Step 3: Check the new date**

Show the current due date and invites sent, and the number of bids already received. Warn when bids are already in, because changing the date can affect bidders who have submitted.

**Step 4: Confirm**

State the old date, the new date and the values that will be carried over. Ask the user to confirm. Do nothing until they say yes.

**Step 5: Write and verify**

Call `procore-update-bid-package` with the package `id`, `project-id`, `title`, both messages and `bid-due-date` set to {new-due-date}. Then re-read with `procore-get-bid-packages` and report the stored due date.

**Rules & Guidelines:**

* The only tools that may write are `procore-update-bid-package`. Call each one only after the user has confirmed the exact values, and never in a loop to retry a failed call.
* Never call any delete, move or import tool in this prompt.
* If a call fails, report the error as returned and stop. Do not retry with altered values.
* Do not change any optional field such as the manager or the pre-bid dates.

**Validation:**

* If the new date is earlier than the current one, say so in the confirmation.
* If the verify read shows a different date, report it and stop.

Who it's for

One answer, three teams that use it

Estimators

Extend a deadline in one message

Give subcontractors more time without retyping the package, while keeping the rest unchanged.

Push the Mechanical bid package on Fabrikam Plaza out to 10 December 2026.

Preconstruction managers

See who is affected by the move

Check how many bids are already in before you change a date that bidders have worked to.

How many bids are in on the Electrical package for Contoso Medical Centre, and move it to 1 December.

Bid coordinators

Handle a late addendum

Move the due date after an addendum goes out and confirm the stored date afterwards.

Reschedule the Concrete package on Northwind Warehouse to 15 December because of addendum 2.

How it works

What PopdockAI does when you ask

You give the package and the new date and your AI assistant carries over everything else. Nothing is changed until you confirm, and a date that moves earlier is called out in the confirmation.

Ask

You name the bid package and give the new due date.

Your AI tool

Check

It finds the package, carries over its values and shows bids already received.

procore-get-bid-packages
procore-get-estimating-bid-board-projects

Confirm

You see the old and new dates and the carried values and say yes.

No items found.

Update

It changes only the due date and reads the package back.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-bid-packages

Returns Procore Preconstruction bid packages for the company, with due dates and the project each belongs to.
get-data

procore-get-estimating-bid-board-projects

Returns Procore Preconstruction bid board projects, with status and the assigned estimator.
run-action

procore-update-bid-package

Update Procore bid package through the Procore connector. The action tool is built Inactive and has not been run end to end through MCP; it writes to live Procore data, so test it in a sandbox before switching it on.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

A new deadline with nothing else disturbed

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation