See which Procore drawings are current, stale or unpublished
For project teams who want the drawing register reviewed for stale and unpublished sheets, by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
Crews build from stale drawings nobody knew were superseded
In Procore, drawing revisions, sets, areas and uploads sit on different screens, so nobody sees which sheets have unpublished or old revisions. Teams end up building from the wrong version.
Without PopdockAI
- Open the drawing log and sort by revision
- Open each set to count unpublished drawings
- Check the upload queue for failures
- Compare revision dates to spot old sheets
With PopdockAI
- Revisions, sets, areas and disciplines are read together
- The latest revision per drawing is shown with its date
- Unpublished drawings and failed uploads are listed
- Sheets older than 90 days are flagged
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** Review the drawing register of {project-name}, optionally only discipline {discipline-name}, and show what is current, superseded or unpublished.
**Step 1: Resolve the project**
Call `procore-get-viewer-documents-accessible-tools` with `project-name` equal to {project-name} to resolve the project id. If nothing matches, retry with `project-name.contains`. If more than one project matches, list them with their ids and stop and ask which one. If the user named a Procore company, pass it in the `company` parameter on every call.
**Step 2: Read the register**
Call `procore-get-drawing-revisions` with the `project-id` (and `discipline-name.contains` if {discipline-name} is given), then `procore-get-drawing-sets`, `procore-get-drawing-areas` and `procore-get-drawing-disciplines` with the `project-id`.
**Step 3: Check uploads**
Call `procore-get-drawing-uploads` with the `project-id` and note uploads whose `status` is not complete.
**Step 4: Report**
Output counts by discipline and area, the latest revision per drawing with its date, sets with unpublished drawing counts, and uploads still processing or failed. Flag drawings whose latest revision is older than 90 days.
**Rules & Guidelines:**
* This prompt is read-only. Never call any create, update, delete, bulk, send, restore or sync tool (for example `procore-create-rfi`, `procore-update-punch-item`, `procore-delete-incident` or `procore-send-punch-item-email`).
* Report only what the tools return. Do not guess missing dates, amounts or names; mark them as missing.
* Counts come from the records returned, and `max-records` caps each call, so say when a call returned its cap and the picture may be partial.
**Validation:**
* If the project cannot be resolved, stop and say so. Do not read records from an unresolved project.
* If the main read returns nothing, say the project has none and stop. Do not fill the gap with assumptions.
Who it's for
One answer, three teams that use it
Document controllers
Keep the register current
See unpublished drawings and failed uploads per set, so the register is cleaned up before the next issue.
Review the drawing register for Fabrikam Depot and list unpublished drawings by set.
Project engineers
Check a discipline before issue
Look at one discipline's latest revisions and dates before it goes out to the site.
Show the latest revision of every mechanical drawing on Contoso Warehouse with its date.
Site managers
Avoid building from old sheets
See which drawings have not been revised in over 90 days and which have newer unpublished ones.
On Northwind Plaza, which structural drawings have unpublished revisions?
How it works
What PopdockAI does when you ask
You name the project and your AI assistant reads the drawing register in Procore. It marks missing values, says when a read hit its cap and never publishes or sends a drawing.
Ask
You name the project, and optionally a discipline.
Read
It resolves the project and reads the revisions, sets, areas and disciplines.
Check
It checks the drawing uploads and notes any that are still processing or failed.
Report
You get counts, the latest revision per drawing, unpublished counts per set and sheets older than 90 days.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-viewer-documents-accessible-tools
procore-get-drawing-revisions
procore-get-drawing-sets
procore-get-drawing-areas
procore-get-drawing-disciplines
procore-get-drawing-uploads
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
The right drawings in the right hands
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)