/
/
See damaged and depleted Procore stock before it runs out
For materials and site teams who want a project's stock position checked, by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
Stock is re-keyed until material runs out
Counts are copied into spreadsheets, so damaged and in-transit quantities are not visible to the project. The problem appears when the material is needed and is not there.
Without PopdockAI
- Export or re-key stock into a spreadsheet
- Look up where each item sits
- Check change history for damaged or in-transit items
- Find out an item is depleted when the crew asks
With PopdockAI
- Materials are read with every stock quantity
- Locations are looked up for the top items
- Recent changes are checked for the biggest problem items
- Damaged, depleted and over-issued items are flagged
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** Report the stock position of the materials in {project-name}, optionally only items whose name contains {material-name}.
**Step 1: Read the materials**
Call `procore-get-materials-mgmt-materials` with the project filter. Use the `project-name` filter (or `project-name.contains` if the user gave a partial name) on the main read to scope it to {project-name}. If the first records show more than one distinct project name, list the project names and ask which one is meant before going further. If the user named a Procore company, pass it in the `company` parameter on every call. Add `name.contains` for {material-name} when given.
**Step 2: Check locations**
For the top ten items by quantity on hand, call `procore-get-nested-materials-mgmt-materials-locations` with `materials-management-material-name` to see where the stock sits.
**Step 3: Check recent movement**
Call `procore-get-materials-mgmt-materials-change-history` with the project filter to see recent changes to the items with the largest damaged or in-transit quantities.
**Step 4: Report**
Output a table: material, resource type, available, damaged, in transit, issued, left to receive, ordered. Flag items with damaged stock, with zero available and quantity left to receive, or with large issued quantities against little available. List the locations for the top items.
**Rules & Guidelines:**
* This prompt is read-only. Never call any create, update, delete, bulk, sync, restore, associate or comment tool (for example `procore-update-equipment-register`, `procore-delete-equipment-register`, `procore-create-shipment` or `procore-update-transfer`).
* Report only what the tools return. Do not guess missing dates, quantities or names; mark them as missing.
* `max-records` caps each call, so say when a call returned its cap and the picture may be partial.
**Validation:**
* If the project name matches no records, say so and stop. Do not read records from a guessed project.
* If the main read returns nothing, say there are none and stop. Do not fill the gap with assumptions.
Who it's for
One answer, three teams that use it
Materials managers
Keep stock honest
See damaged, in-transit and issued quantities for every material in one table, without a spreadsheet.
Show stock for all materials on Contoso Warehouse and flag anything damaged.
Site superintendents
Know where it sits
Find which items are low or zero and where the stock is located on site.
Where is the conduit stored on Fabrikam Depot, and how much is available?
Project engineers
Spot over-issued items
Find items with large issued quantities against little available, before the next requirement.
Which materials on Northwind Plaza have issued quantities well above what is available?
How it works
What PopdockAI does when you ask
You name the project, and optionally a material, and your AI assistant reads the stock. Quantities that are missing are marked missing, and stock is never edited.
Ask
You name the project and optionally part of a material name.
Read
It reads the project's materials with their available, damaged, in-transit and issued quantities.
Check
It looks up locations for the top items and recent changes for the largest damaged or in-transit quantities.
Report
It gives a table and flags damaged, depleted and over-issued items.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-materials-mgmt-materials
procore-get-nested-materials-mgmt-materials-locations
procore-get-materials-mgmt-materials-change-history
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
Stock problems seen before they stop the work
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)
