Review Procore project earned hours
Report

See a Procore project's earned hours and efficiency at a glance

For project managers who want labor performance rolled up from cost code rows, by asking their AI assistant.

Try PopdockAI free
Get a live demo
Review Procore project earned hours
Summarize the labor performance of project 2024-118 using only cost codes with at least 100 budgeted hours.
Project 2024-118 is behind plan, with overall efficiency of 0.91 across 46 cost codes. - Totals: 18,400 budgeted, 11,250 actual, 10,240 earned, 7,150 remaining - Lowest efficiency: 03-300 Concrete, 05-120 Steel, 09-250 Drywall - Most hours remaining: 03-300, 26-050 Electrical, 23-000 Mechanical Want the cost codes with zero budgeted hours listed as excluded?
Procore
Sample figures. Your results come from your own account.
procore-get-field-production-report

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Project labor performance means adding up dozens of rows

A field production report lists earned and actual hours by cost code, so a project view means summing every row. Efficiency and the weakest cost codes only appear after you do the arithmetic.

Without PopdockAI

  • Export the field production rows
  • Total budgeted, actual and earned hours
  • Divide earned by actual for efficiency
  • Hunt for the weakest cost codes by eye

With PopdockAI

  • Rows are read for the project and the budgeted hours floor
  • Totals and overall efficiency are worked out
  • The three weakest and the three with most hours left are named
  • Zero values are excluded from ratios, never divided by

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Summarize the labor performance of the project numbered {project-number}, using only cost codes with at least {min-budgeted-hours} budgeted hours (default 0).

**Step 1: Pull the rows**

Call procore-get-field-production-report with project-number set to {project-number}. If {min-budgeted-hours} is given, pass it as udgeted-hours.min.

**Step 2: Roll up**

* Total udgeted-hours, ctual-hours, earned-hours, emaining-hours and projected-hours-at-completion across rows.
* Overall efficiency is earned hours divided by actual hours; above 1 is ahead of plan.
* Identify the three cost codes with the lowest efficiency and the three with the highest remaining hours.

**Step 3: Report**

A short totals block, then the two top-three lists, then a one-paragraph verdict: ahead, on plan or behind, with the reason.

**Rules & Guidelines:**

* This is a read-only job. procore-get-field-production-report is the only tool; never attempt to change any Procore record.
* Quote figures exactly as returned; do not invent hours or quantities that are not in the rows.

**Validation:**

* If the read returns no rows, say so, list the filters used, and suggest loosening them.
* If a field is blank or zero (for example budgeted hours of 0), note it and exclude it from ratios instead of dividing by it.

Who it's for

One answer, three teams that use it

Project managers

Know if labor is ahead or behind

Get one verdict on labor performance with the reason, before you report to the owner.

Is project 2024-205 ahead or behind on labor, and what is the reason?

Cost engineers

Find the weakest cost codes

See the three cost codes with the lowest efficiency and the three with most hours remaining.

Show the weakest cost codes by efficiency on project 2024-087, ignoring codes under 50 budgeted hours.

Operations directors

Compare a project at a glance

Get totals and overall efficiency for a project without opening the field production report.

Give me total earned and actual hours and efficiency for project 2023-412.

How it works

What PopdockAI does when you ask

You give the project number and your AI assistant rolls up the rows. Figures are quoted exactly as returned and nothing in Procore is changed.

Ask

You give the project number and optionally a minimum number of budgeted hours.

Your AI tool

Pull

It reads the project's field production rows.

procore-get-field-production-report

Roll up

It totals the hours, works out efficiency and finds the weakest cost codes and those with most hours left.

No items found.

Report

It gives the totals, two top three lists and a verdict.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-field-production-report

Returns Procore Helix field production report summary rows: budgeted versus actual hours, quantities and production rates by project and cost code. Filter by project. The tool is built Inactive until switched on.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

Earned versus actual hours explained in one verdict

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation