/
/
See Procore project activity beside Intacct cost
For project managers who want a project's Procore items shown next to its Intacct bills and hours by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
Field activity and cost live in two systems
To see whether the work matches the money, a project manager opens Procore for the items and Intacct for the bills and timesheets, then lines them up by hand. Open items on a finished project, or cost with no activity, go unseen.
Without PopdockAI
- Find the project's accounting number in Procore
- Open the matching project in Intacct
- Pull bill lines and timesheet hours by hand
- Compare them with the Procore items yourself
With PopdockAI
- The accounting number links the Procore project to Intacct
- Bill lines and hours are read for that one project
- Three observations flag where work and money disagree
- Currency is never converted and zero spend is never assumed
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** For Procore project `{project-number}`, show the Procore items alongside the Intacct cost already posted to the matching project, from `{date-from}` (default: the start of the current year).
**Servers:** this prompt uses tools from two servers, so both procore-company-admin (Procore) and intacct (Intacct) must be connected. Tools whose names start with procore are on procore-company-admin; tools whose names start with intacct are on intacct.
**Step 1: Establish the project on both sides**
Call `procore-get-generic-tools-generic-tool-items` (Procore) filtered by `project-number` and `date-created.from` set to `{date-from}`. Take the project accounting project number from the first result. If the project has no accounting number, report that and stop. Call `intacct-get-project` (Intacct) with it as `project-id`. If none or more than one match, report that and stop.
**Step 2: Pull Intacct cost**
Call `intacct-get-bill-line` (Intacct) with `project-id` and `entry-date.from` set to `{date-from}`. Call `intacct-get-timesheet-entry` (Intacct) with `project-id` and `entry-date.from` set to `{date-from}`.
**Step 3: Report**
Show: the Intacct project (name, status, contract amount, actual amount, percent complete); Procore items by status with counts; Intacct bill lines grouped by vendor with totals; Intacct hours by employee with totals. Close with three observations: Procore items still open on a project Intacct shows as complete, Intacct cost with no Procore activity in the period, and bill lines with no vendor or account.
**Rules & Guidelines:**
* This prompt is read-only. Never call any Procore tool that creates, updates, deletes or batch-updates, nor any Intacct tool that creates or updates.
* Report amounts in Intacct's transaction currency and do not convert.
**Validation:**
* If Procore has no items in the period, still report the Intacct cost and say Procore was empty.
* If Intacct has no bill lines or hours, say so; do not infer zero spend.Who it's for
One answer, three teams that use it
Project managers
Check the money matches the work
See Procore items alongside the cost posted in Intacct for the same project, with the odd ones out called out.
Show Procore items against Intacct cost for project 2026-121 since the start of the year.
Project controllers
Find cost with no activity
Spot Intacct cost in a period where Procore shows no activity, before it turns into a surprise at month end.
For project 2026-130, is there Intacct cost posted with no Procore activity since 1 September?
Operations directors
Review a job at a glance
Get the Intacct status and amounts with the Procore items by status in one view, without opening both systems.
Give me Procore activity against Intacct spend for project 2026-114, Riverside Tower.
How it works
What PopdockAI does when you ask
You give a project number in plain words. Your AI assistant links the two systems through the accounting number and reports what each side shows, changing nothing.
Ask
You give the Procore project number and optionally a start date.
Establish
It finds the accounting number in Procore and the single matching project in Intacct.
Pull
It reads the Intacct bill lines and timesheet hours posted to that project since the start date.
Report
You get Procore items by status, cost by vendor and employee, and three observations.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-generic-tools-generic-tool-items
sage-intacct-get-project
sage-intacct-get-bill-line
sage-intacct-get-timesheet-entry
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
Work and money read side by side
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)
