Connectors

/

Procore

/

Create a Procore task for a bid package deadline
Write

Turn a bid due date into a Procore review task

For estimators and bid managers who want a task created ahead of a bid deadline by asking their AI assistant.

Try PopdockAI free
Get a live demo
Create a Procore task for a bid package deadline
Create a task to review bids for the Structural Steel package on project 4521, due 10 days before the bid deadline.
The Structural Steel package is due 2027-01-15, so the review task would be due 2027-01-05. - Task: Review bids for Structural Steel before due date - Project: Riverside Tower (active) - Package number: 05-1000, 3 bids received - No open task mentions this package Shall I create the task?
Procore
Sample figures. Your results come from your own account.
procore-get-bid-packages
procore-get-projects
procore-get-task-items
procore-create-task

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

The bid review reminder is typed in by hand

The bid due date sits in Preconstruction while the reminder to review bids has to be added to Procore tasks manually. It arrives late, is created twice or is forgotten, and the deadline passes without a review.

Without PopdockAI

  • Look up the bid package due date
  • Work out the date a week before it
  • Check Procore tasks for an existing reminder
  • Type the task, or forget to

With PopdockAI

  • The due date is read from the bid package
  • The task date is worked out from your lead time
  • An existing open task stops the job
  • One task is created after you confirm

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** For the bid package matching {bid-package-title} on project id {project-id}, create one Procore task due {lead-days} days (default 7) before the bid due date, unless a matching task already exists.

**Step 1: Find the bid package (procore-preconstruction)**

Call `procore-get-bid-packages` with `project-id` set to {project-id} and `title.contains` set to {bid-package-title}. If more than one package matches, list them and stop. If none match, say so and stop. Note `number`, `title`, `bid-due-date` and `bids-received-count`.

**Step 2: Check the project and existing tasks (procore-core)**

Call `procore-get-projects` with `project-id` set to {project-id}. If the project is not active, report that and stop. Note `project-name`. Then call `procore-get-task-items` with `project-name` set to that name and `title.contains` set to the bid package title. If an open task already mentions the package, show it and stop without creating anything.

**Step 3: Confirm**

Compute the due date as the bid due date minus {lead-days} days (default 7). Show the proposed task: title "Review bids for {bid-package-title} before due date", due date, project, and a description including the package number and bid due date. Ask the user to confirm. Do not continue without an explicit yes.

**Step 4: Create (procore-core)**

Only after confirmation, call `procore-create-task` once with `project-id` set to {project-id}, the title, `due-date` and `description` shown. Pass `assigned-id` only when the user named an assignee. Report the created task id and due date.

**Rules & Guidelines:**

* `procore-get-bid-packages` is on procore-preconstruction. `procore-get-projects`, `procore-get-task-items` and `procore-create-task` are on procore-core.
* `procore-create-task` is the only write, it runs at most once, and only after the confirmation in Step 3.
* Never update or delete tasks, and never call any Preconstruction write tool.

**Validation:**

* If the computed due date is already in the past, tell the user and ask for a different date before creating anything.
* If `procore-create-task` fails or is unavailable, report the error and the proposed task text so it can be created by hand.

Who it's for

One answer, three teams that use it

Estimators

Never miss the bid review

Get a task due before each package closes, with the package number and deadline in its description.

Create a bid review task for the Mechanical package on project 3318, 5 days before it closes.

Preconstruction managers

Cover every open package

Set one reminder per package without opening each in Preconstruction to read the date.

For the Roofing package on project 2760 create the usual review task, 7 days before the bid due date.

Project coordinators

Avoid duplicate reminders

An open task that already mentions the package stops the request, so the team gets one reminder.

Add a task to review bids for Electrical on project 4102, due 3 days ahead, unless one already exists.

How it works

What PopdockAI does when you ask

You name the bid package and your AI assistant reads its deadline and checks for an existing task. It creates a single task only after you have seen it and said yes.

Ask

You name the project and bid package, and optionally how many days ahead the task is due.

Your AI tool

Find

It reads the package and its due date, checks the project is active and looks for an open task.

procore-get-bid-packages
procore-get-projects
procore-get-task-items

Confirm

You see the task title, due date, project and description and say yes.

No items found.

Create

It creates one task and reports its id and due date.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-bid-packages

Returns Procore Preconstruction bid packages for the company, with due dates and the project each belongs to.
get-data

procore-get-projects

Returns the projects in Procore, with project number, name, stage, active flag and dates. Filter by name, number or status.
get-data

procore-get-task-items

Returns Procore task items with title, status, assignee and due date. Filter by project, title and status.
run-action

procore-create-task

Creates a task in Procore on a project, with title, description, assignee and due date. This is a write tool: it is built Inactive and has not been run end to end through MCP, so test it in a Procore sandbox before switching it on.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

Every bid deadline gets its review reminder

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation