/
/
Turn a bid due date into a Procore review task
For estimators and bid managers who want a task created ahead of a bid deadline by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
The bid review reminder is typed in by hand
The bid due date sits in Preconstruction while the reminder to review bids has to be added to Procore tasks manually. It arrives late, is created twice or is forgotten, and the deadline passes without a review.
Without PopdockAI
- Look up the bid package due date
- Work out the date a week before it
- Check Procore tasks for an existing reminder
- Type the task, or forget to
With PopdockAI
- The due date is read from the bid package
- The task date is worked out from your lead time
- An existing open task stops the job
- One task is created after you confirm
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** For the bid package matching {bid-package-title} on project id {project-id}, create one Procore task due {lead-days} days (default 7) before the bid due date, unless a matching task already exists.
**Step 1: Find the bid package (procore-preconstruction)**
Call `procore-get-bid-packages` with `project-id` set to {project-id} and `title.contains` set to {bid-package-title}. If more than one package matches, list them and stop. If none match, say so and stop. Note `number`, `title`, `bid-due-date` and `bids-received-count`.
**Step 2: Check the project and existing tasks (procore-core)**
Call `procore-get-projects` with `project-id` set to {project-id}. If the project is not active, report that and stop. Note `project-name`. Then call `procore-get-task-items` with `project-name` set to that name and `title.contains` set to the bid package title. If an open task already mentions the package, show it and stop without creating anything.
**Step 3: Confirm**
Compute the due date as the bid due date minus {lead-days} days (default 7). Show the proposed task: title "Review bids for {bid-package-title} before due date", due date, project, and a description including the package number and bid due date. Ask the user to confirm. Do not continue without an explicit yes.
**Step 4: Create (procore-core)**
Only after confirmation, call `procore-create-task` once with `project-id` set to {project-id}, the title, `due-date` and `description` shown. Pass `assigned-id` only when the user named an assignee. Report the created task id and due date.
**Rules & Guidelines:**
* `procore-get-bid-packages` is on procore-preconstruction. `procore-get-projects`, `procore-get-task-items` and `procore-create-task` are on procore-core.
* `procore-create-task` is the only write, it runs at most once, and only after the confirmation in Step 3.
* Never update or delete tasks, and never call any Preconstruction write tool.
**Validation:**
* If the computed due date is already in the past, tell the user and ask for a different date before creating anything.
* If `procore-create-task` fails or is unavailable, report the error and the proposed task text so it can be created by hand.Who it's for
One answer, three teams that use it
Estimators
Never miss the bid review
Get a task due before each package closes, with the package number and deadline in its description.
Create a bid review task for the Mechanical package on project 3318, 5 days before it closes.
Preconstruction managers
Cover every open package
Set one reminder per package without opening each in Preconstruction to read the date.
For the Roofing package on project 2760 create the usual review task, 7 days before the bid due date.
Project coordinators
Avoid duplicate reminders
An open task that already mentions the package stops the request, so the team gets one reminder.
Add a task to review bids for Electrical on project 4102, due 3 days ahead, unless one already exists.
How it works
What PopdockAI does when you ask
You name the bid package and your AI assistant reads its deadline and checks for an existing task. It creates a single task only after you have seen it and said yes.
Ask
You name the project and bid package, and optionally how many days ahead the task is due.
Find
It reads the package and its due date, checks the project is active and looks for an open task.
Confirm
You see the task title, due date, project and description and say yes.
Create
It creates one task and reports its id and due date.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-bid-packages
procore-get-projects
procore-get-task-items
procore-create-task
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
Every bid deadline gets its review reminder
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)
