Create Procore tasks on the right project, for the right person
For project teams who want a task created in Procore with an assignee and due date by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
Tasks end up on the wrong project or person
Creating a task means choosing a project, an assignee and a category, and remembering whether the same title is already there. A wrong pick sends the task to the wrong place, and duplicates accumulate.
Without PopdockAI
- Open the right project from a long list
- Search for the assignee on that project
- Scan existing tasks for the same title
- Fix the task that went to the wrong person
With PopdockAI
- The project must match exactly once
- The assignee is matched to a real person on the project
- An existing task with the same title is shown first
- You confirm the values and the new task is read back
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** Create a task titled `{title}` on project `{project-name}`, due `{due-date}` (optional), assigned to `{assignee-name}` (optional).
**Step 1: Resolve the project**
Call `procore-get-projects` with `project-name.contains` set to `{project-name}`. If zero or more than one project matches, list the matches and stop. Keep `project-id`.
**Step 2: Resolve the assignee and category**
* If `{assignee-name}` is given, call `procore-get-assignable-users` with `project-id` and `name`. If more than one person matches, list them and stop. Keep the person's `id` as the assigned id.
* Call `procore-get-task-item-categories` with `project-id` and show the categories; use none unless the user names one.
* Call `procore-get-task-items` with `project-name` and `title` set to `{title}`. If a task with that title exists, show it and ask whether to create another.
**Step 3: Confirm**
Show the project, title, assignee, category and due date. Ask for explicit confirmation. Do nothing until the user confirms.
**Step 4: Create and verify**
Call `procore-create-task` once with `project-id`, `title`, and the optional `assigned-id`, `due-date` and `task-item-category-id`. Then call `procore-get-task-items` with `project-name` and `title` and report the new task's number, status and due date.
**Rules & Guidelines:**
* The only write tool allowed is `procore-create-task`, called once, after confirmation.
* Do not call update, delete or send tools. Do not send the task to anyone.
* Work in the default company; do not pass a company.
**Validation:**
* If the due date is not YYYY-MM-DD or is in the past, stop and ask for a corrected date.
* If the title is empty, stop.Who it's for
One answer, three teams that use it
Project managers
Hand out work without the clicks
Create a task with a due date and an owner from a single message, straight after a meeting.
Create a task Chase mechanical RFI responses on Fabrikam Depot, due 2026-12-12, assign it to Sam Patel.
Project coordinators
Stop duplicate tasks
Existing tasks with the same title are shown before a new one is made, so the team is not given the same job twice.
Add a task Update insurance certificates on Contoso Warehouse, due 2027-01-08, unless it already exists.
Field engineers
Log a to do from the site
Capture a follow up as a task with no category and no assignee when you only have a title, and refine it later.
Create a task Check slab levels at grid C on Northwind Plaza with no due date and no assignee.
How it works
What PopdockAI does when you ask
You give the task in plain words. Your AI assistant resolves the project and person and creates one task only after you have seen it and said yes.
Ask
You give the title, the project, and optionally a due date and an assignee.
Resolve
It finds the one matching project and person and checks for a task with the same title.
Confirm
You see the project, title, assignee, category and due date and say yes.
Create
It creates the task once and reports its number, status and due date.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-projects
procore-get-assignable-users
procore-get-task-item-categories
procore-get-task-items
procore-create-task
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
Tasks that reach the right person once
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)