Connectors

/

Procore

/

Log a note or task on a Procore bid board project
Write

Put bid call follow-ups on the bid board

For estimators and preconstruction teams who want a note or task on a bid board project without leaving the call notes, just by asking.

Try PopdockAI free
Get a live demo
Log a note or task on a Procore bid board project
Add a task to the Fabrikam Plaza bid board project: send revised mechanical scope to Contoso Mechanical, due 20 November.
One bid board project matches Fabrikam Plaza, and no task has this text yet. - Project: Fabrikam Plaza - Kind: Task - Text: Send revised mechanical scope to Contoso Mechanical - Due date: 20 Nov 2026, no assignee set Shall I add it?
Procore
Sample figures. Your results come from your own account.
procore-get-estimating-bid-board-projects
procore-get-estimating-bid-board-projects-notes
procore-get-estimating-bid-board-projects-tasks
procore-create-estimating-bid-board-projects-notes
procore-create-estimating-bid-board-projects-tasks

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Bid call follow-ups never make it onto the board

After a call, keying each follow-up into the bid board is one more step, so it slips. When it is entered, the same note is often added twice by different people.

Without PopdockAI

  • Open the bid board and find the right project
  • Read the existing notes and tasks for a repeat
  • Type the note or task and due date
  • Realise later that it was entered twice or not at all

With PopdockAI

  • The bid board project is found and an ambiguous name stops the job
  • Existing notes or tasks with the same text are shown first
  • You approve the exact text and due date before it is saved
  • One entry is added with no assignee and read back

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Add a {kind} to the bid board project "{project-name}" with the text "{text}" (task due date {due-date} if given).

**Step 1: Validate**

{kind} must be exactly note or task. If not, ask which one is meant and stop. A due date only applies to a task. If it is given with a note, say it will be ignored.

**Step 2: Find the project**

Call `procore-get-estimating-bid-board-projects` with `name.contains` set to {project-name}. If more than one matches, list them and stop.

**Step 3: Avoid a repeat**

Read the existing entries: `procore-get-estimating-bid-board-projects-notes` for a note or `procore-get-estimating-bid-board-projects-tasks` for a task, with `bid-board-project-name` set to the matched name. If the same text appears, show it and ask whether to add it again.

**Step 4: Confirm**

Show the project, the kind, the exact text and the due date. Ask the user to confirm. Do nothing until they say yes.

**Step 5: Write and verify**

For a note call `procore-create-estimating-bid-board-projects-notes` with `bid-board-project-id` and `value`. For a task call `procore-create-estimating-bid-board-projects-tasks` with `bid-board-project-id`, `value` and `due-date` when given. Re-read the matching list and report the new entry.

**Rules & Guidelines:**

* The only tools that may write are `procore-create-estimating-bid-board-projects-notes` and `procore-create-estimating-bid-board-projects-tasks`. Call each one only after the user has confirmed the exact values, and never in a loop to retry a failed call.
* Never call any delete, move or import tool in this prompt.
* If a call fails, report the error as returned and stop. Do not retry with altered values.
* Add exactly one entry per run and set no assignee.

**Validation:**

* If the verify read does not show the new entry, say so rather than assuming it worked.

Who it's for

One answer, three teams that use it

Estimators

Log a follow-up straight from the call

Capture what was agreed with a subcontractor as a task on the project while it is still fresh.

Add a note to the Riverside Tower bid board project: Northwind Steel confirmed pricing holds until 30 November.

Preconstruction managers

Keep the bid board a real record

Make sure follow-ups are on the board once and with a due date, so the team works from one list.

Add a task to the Contoso Medical Centre bid board project to confirm alternates by 18 November.

Business development leads

Note the client conversation

Put what the client said on the project right after the meeting without waiting for an estimator to key it.

Add a note to the Fabrikam Plaza bid board project that the owner wants a revised schedule with the next submission.

How it works

What PopdockAI does when you ask

You say what to record and your AI assistant finds the project and checks for a repeat. Nothing is written until you confirm the exact text, and it adds one entry per request.

Ask

You say note or task, name the project and give the text and a due date.

Your AI tool

Find

It finds the single matching bid board project.

procore-get-estimating-bid-board-projects
procore-get-estimating-bid-board-projects-notes
procore-get-estimating-bid-board-projects-tasks

Check

It reads existing entries and shows you if the same text is there.

No items found.

Confirm

You approve the exact text, then it adds one entry and reads it back.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-estimating-bid-board-projects

Returns Procore Preconstruction bid board projects, with status and the assigned estimator.
get-data

procore-get-estimating-bid-board-projects-notes

Returns the notes on a Procore bid board project. Needs the bid board project id.
get-data

procore-get-estimating-bid-board-projects-tasks

Returns Procore bid board project tasks from the Procore connector. Read-only.
run-action

procore-create-estimating-bid-board-projects-notes

Adds a note to a Procore bid board project. Action tool: built Inactive and not yet run end to end through MCP, so test it against a sandbox Procore company before switching it on.
run-action

procore-create-estimating-bid-board-projects-tasks

Creates a task on a Procore Preconstruction bid board project. A write tool that has not been run end to end through MCP; test it in a sandbox first.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

Every agreed follow-up is on the board

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation