Change a Procore bid board status with the reason on record
For project teams who want a bid board project status updated with a logged reason, after a check, by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
Status changes are made by hand with no record of why
On the bid board a status is changed with no reason attached. A typo can create a status the reports do not recognise, and a similar project name risks updating the wrong bid.
Without PopdockAI
- Search the bid board for the project name
- Type the new status and hope it matches the settings
- Add a note separately, if anyone remembers
- Check afterwards that the right project changed
With PopdockAI
- The one matching project is found, and several matches stop it
- The new status is checked against the estimating settings
- You confirm the status and note before anything changes
- Only the status is changed, then the project is read back
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** Change the status of the bid board project "{project-name}" to "{new-status}" and, if {reason} is not empty, log it as a note.
**Step 1: Find the project**
Call `procore-get-estimating-bid-board-projects` with `name.contains` set to {project-name}. If more than one matches, list them and stop. If none match, stop.
**Step 2: Validate**
Call `procore-get-estimating-settings` and check that {new-status} is a status it defines. Show the project's current status next to the new one. If they are the same, say so and stop.
**Step 3: Confirm**
State the project, current status, new status and the note text. Ask the user to confirm. Do nothing until they say yes.
**Step 4: Write and verify**
Call `procore-update-bid-board-project` with the project's `id` as `bid-board-project-id` and `status` set to {new-status}. If a reason was given, call `procore-create-estimating-bid-board-projects-notes` with the same project id and `value` set to {reason}. Then re-read the project with `procore-get-estimating-bid-board-projects` and report the new status.
**Rules & Guidelines:**
* The only tools that may write are `procore-update-bid-board-project` and `procore-create-estimating-bid-board-projects-notes`. Call each one only after the user has confirmed the exact values, and never in a loop to retry a failed call.
* Never call any delete, move or import tool in this prompt.
* If a call fails, report the error as returned and stop. Do not retry with altered values.
* Change only the status. Do not pass any other field to the update.
**Validation:**
* If the verify read does not show the new status, say so rather than assuming it worked.Who it's for
One answer, three teams that use it
Estimators
Move a bid forward with a reason
Update a bid's status and log why in one message, so the history shows the decision and not just the change.
Set the Fabrikam Depot bid to Won and note that the owner confirmed by phone.
Preconstruction managers
Keep statuses clean
Have each new status checked against the estimating settings, so reports never meet a status they do not know.
Move the Contoso Warehouse bid to No Bid, reason: scope outside our trades.
Business development leads
Record why a bid was lost
Log the reason for a status change as a note on the bid, so the lessons are on record when you review the pipeline.
Change Northwind Plaza Phase 1 to Lost with the note: price 6 percent above winning bid.
How it works
What PopdockAI does when you ask
You name the project, the new status and the reason in plain words. Your AI assistant checks it, shows you the change and updates only after you say yes.
Ask
You give the project name, the new status and optionally the reason.
Validate
It finds the one matching project and checks the new status against the estimating settings.
Confirm
You see the current status, new status and note text and say yes.
Update
It changes the status, logs the reason as a note and reads the project again to report the result.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-estimating-bid-board-projects
procore-get-estimating-settings
procore-update-bid-board-project
procore-create-estimating-bid-board-projects-notes
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
Every status change valid, explained and checked
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)