Check bid packages line up with the Procore project record
For preconstruction managers who want bid dates checked against project stage and start dates, by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
Bid packages and the project record never get compared
Bid packages sit in Preconstruction while the project stage, status and dates sit in the core project record. Nobody lines them up, so a bid due after the start date or on an inactive project goes unnoticed.
Without PopdockAI
- Open the project's bid packages in Preconstruction
- Open the project record for stage and status
- Look up milestone and start dates separately
- Compare every bid due date by hand
With PopdockAI
- Both records are read for the same project id
- Inactive projects and late bid dates are flagged
- Packages with no invites or no bids are marked
- Missing dates are named and those checks skipped
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** For project id {project-id}, check that its bid packages line up with the project record: the project is active, bid due dates fall before the planned start, and every package has invites and bids.
**Step 1: Read the bid packages (procore-preconstruction)**
Call `procore-get-bid-packages` with `project-id` set to {project-id}. Collect `number`, `title`, `bid-due-date`, `bid-invites-sent-count` and `bids-received-count`. If nothing is returned, say the project has no bid packages and stop.
**Step 2: Read the project record (procore-core)**
Call `procore-get-projects` with `project-id` set to {project-id}. Note `project-name`, `active`, `stage`, `estimated-value` and `actual-start-date`. If no project comes back, report that the bid packages point at a project the connected user cannot see or that does not exist, and stop.
**Step 3: Read the project milestones (procore-core)**
Call `procore-get-project-dates` with `project-id` set to {project-id}. Note any dated milestones, in particular start and award related dates.
**Step 4: Report**
Give a short header (project name, active flag, stage, estimated value, start date), then a table of bid packages with due date, invites sent, bids received and a flag. Flag a package when the project is inactive, when its bid due date is after the project start date or a milestone it should precede, when no invites have been sent, or when the due date has passed with no bids received.
**Rules & Guidelines:**
* `procore-get-bid-packages` is on procore-preconstruction. `procore-get-projects` and `procore-get-project-dates` are on procore-core.
* The join key is the numeric project id, which both servers expose as `project-id`.
* Both servers are read-only for this job. Do not call any create, update, delete or sync tool on either server.
**Validation:**
* If dates are missing on the project record, say which ones and skip those comparisons rather than assuming.
* State clearly when a flag rests on a missing field.Who it's for
One answer, three teams that use it
Preconstruction managers
Check a project before bids close
Confirm every bid package fits the project stage and falls before the planned start, in one request.
Check whether the bid packages on Procore project 5120 all fall before the planned start date.
Estimating coordinators
Find packages with no response
See packages with no invites sent or no bids received after the due date, per project.
Which Fabrikam Depot bid packages have passed their due date with no bids received?
Project controls analysts
Spot packages on inactive projects
Flag bid packages that point at an inactive project, or a project the connected user cannot see.
Review project 3308 bid packages and tell me if the project is still active.
How it works
What PopdockAI does when you ask
You give the project id and your AI assistant reads the bid packages and the project record in Procore. Both are read only, and it stops clearly if either side has no record.
Ask
You give the project id.
Read bids
It reads the project's bid packages with due dates, invites sent and bids received.
Compare
It reads the project record and milestone dates, then checks status, start date and milestones against each package.
Report
You get a project header and a table of packages with flags, and any flag resting on a missing date is labelled.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-bid-packages
procore-get-projects
procore-get-project-dates
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
Bid timing problems caught before award is delayed
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)