Connectors

/

Procore

/

Review Procore overdue RFIs
Report

Rank overdue Procore RFIs by lateness and impact

For project managers who want overdue RFIs ranked, with who holds the ball and any cost or schedule impact, by asking their AI assistant.

Try PopdockAI free
Get a live demo
Review Procore overdue RFIs
Review the RFIs on Riverside Tower and tell me which overdue ones I should chase first.
Riverside Tower has 9 overdue RFIs out of 31 open, and 3 carry a cost or schedule impact. - RFI-0042: Curtain wall anchor detail, 19 days overdue, ball with Fabrikam Glazing, cost impact - RFI-0051: Slab edge at Level 4, 11 days overdue, ball with the architect, schedule impact - RFI-0057: Fire damper locations, 8 days overdue, replied, waiting on acceptance Want the 2 RFIs with no due date listed separately?
Procore
Sample figures. Your results come from your own account.
procore-get-viewer-documents-accessible-tools
procore-get-rfis
procore-get-nested-rfis-ball-in-courts
procore-get-rfis-replies

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Overdue RFIs hide in a long log

Finding what is late means scrolling the RFI log, then checking who holds the ball and whether anyone replied. RFIs with a cost or schedule impact are the easiest to miss.

Without PopdockAI

  • Scroll the RFI log for past due dates
  • Open each RFI to see who holds the ball
  • Check whether a reply already exists
  • Miss the ones with a cost or schedule impact

With PopdockAI

  • Overdue RFIs are ranked by days overdue
  • Ball in court and reply status are added to each
  • Cost and schedule impact are flagged
  • RFIs with no due date are listed separately

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Review the RFIs in {project-name} and rank them by how urgently they need chasing, treating anything past its due date as of {as-of-date} (default today) as overdue.

**Step 1: Resolve the project**

Call `procore-get-viewer-documents-accessible-tools` with `project-name` equal to {project-name} to resolve the project id. If nothing matches, retry with `project-name.contains`. If more than one project matches, list them with their ids and stop and ask which one. If the user named a Procore company, pass it in the `company` parameter on every call.

**Step 2: Pull the RFIs**

Call `procore-get-rfis` with the `project-id` from Step 1 and `due-date.to` set to {as-of-date} (today if blank). Then call it again without the date filter to get the full count. Records with a `status` of closed or draft are not overdue; skip them for ranking.

**Step 3: Add who holds the ball**

Call `procore-get-nested-rfis-ball-in-courts` with the `project-id` to see who each open RFI is waiting on, and `procore-get-rfis-replies` to see which RFIs already have a reply (an RFI with a reply is waiting on acceptance, not on an answer).

**Step 4: Report**

Output a table: RFI number, subject, responsible contractor, due date, days overdue, status, ball in court, replied (yes or no). Rank by days overdue, then flag every RFI with a cost or schedule impact. End with the three RFIs to chase first and why, and a count of overdue against total open.

**Rules & Guidelines:**

* This prompt is read-only. Never call any create, update, delete, bulk, send, restore or sync tool (for example `procore-create-rfi`, `procore-update-punch-item`, `procore-delete-incident` or `procore-send-punch-item-email`).
* Report only what the tools return. Do not guess missing dates, amounts or names; mark them as missing.
* Counts come from the records returned, and `max-records` caps each call, so say when a call returned its cap and the picture may be partial.
* Overdue means a due date earlier than {as-of-date} on an open RFI. An RFI with no due date goes in a separate 'no due date' list.

**Validation:**

* If the project cannot be resolved, stop and say so. Do not read records from an unresolved project.
* If the main read returns nothing, say the project has none and stop. Do not fill the gap with assumptions.

Who it's for

One answer, three teams that use it

Project managers

Chase the RFIs that matter

See overdue RFIs ranked by days and impact, with the three to chase first and why.

Rank overdue RFIs on Contoso Warehouse and tell me which three to chase first.

Architects and engineers

See what is waiting on you

Find RFIs where the ball is in your court so answers go out before the due date.

Which overdue RFIs on Fabrikam Depot have the ball in the architect's court?

Contract administrators

Spot RFIs with cost impact

Pick out overdue RFIs with a cost or schedule impact to feed change order planning.

List overdue RFIs on Northwind Plaza that carry a cost or schedule impact.

How it works

What PopdockAI does when you ask

You name the project and your AI assistant measures overdue against the date you give. It only reads, and it never guesses a due date.

Ask

You name the project and optionally an as-of date.

Your AI tool

Resolve

It finds the one matching project and stops to ask if several match.

procore-get-viewer-documents-accessible-tools
procore-get-rfis
procore-get-nested-rfis-ball-in-courts
procore-get-rfis-replies

Add

It reads the RFIs, who holds the ball and which already have a reply.

No items found.

Report

It ranks overdue RFIs, flags impact and names the three to chase first.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-viewer-documents-accessible-tools

Returns Procore viewer documents accessible tools records from the Project Management area. Filter by project and by the record's own fields; reads only, nothing is changed.
get-data

procore-get-rfis

Returns Procore requests for information (RFIs) for a project, with status, due date and the responsible contractor.
get-data

procore-get-nested-rfis-ball-in-courts

Returns Procore nested RFIs ball in courts records from the Project Management area. Filter by project and by the record's own fields; reads only, nothing is changed.
get-data

procore-get-rfis-replies

Returns Procore RFIs replies records from the Project Management area. Filter by project and by the record's own fields; reads only, nothing is changed.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

The RFIs that stall the job chased first

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation