Surface RFI cost and schedule impacts before the money is spent
For project managers who want the RFIs with cost or schedule impact totalled and ranked, just by asking.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
RFI impacts surface after the money is spent
Cost and schedule impacts recorded on RFIs sit in the log until someone filters for them. By the time they reach the change order conversation, the work may already be done.
Without PopdockAI
- Filter the RFI log by cost and schedule impact
- Add up the cost values by hand
- Open the question and reply on the larger RFIs
- Work out which are likely to become change events
With PopdockAI
- The project is resolved and RFIs with impact are pulled
- Confirmed cost impact is totalled and unconfirmed cost listed separately
- The question and reply behind the five largest are checked
- Nothing is edited, and a capped read is called out as possibly partial
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** Find the RFIs in {project-name} that carry a cost or schedule impact, with cost impact at or above {min-cost} (default 0), and show what they could add up to.
**Step 1: Resolve the project**
Call `procore-get-viewer-documents-accessible-tools` with `project-name` equal to {project-name} to resolve the project id. If nothing matches, retry with `project-name.contains`. If more than one project matches, list them with their ids and stop and ask which one. If the user named a Procore company, pass it in the `company` parameter on every call.
**Step 2: Pull impactful RFIs**
Call `procore-get-rfis` with the `project-id` and `cost-impact-value.min` set to {min-cost}. Call it a second time with `cost-impact-status` and `schedule-impact-status` set to a confirmed impact value. Merge the two result sets by RFI id.
**Step 3: Check the reasoning**
For the five largest, call `procore-get-nested-rfis-questions` and `procore-get-rfis-replies` with the `project-id` to see whether the question and the reply justify the impact.
**Step 4: Report**
Output a table: RFI number, subject, cost impact value, cost status, schedule status, due date, replied (yes or no). Total the cost impact and list RFIs with a schedule impact but no cost value. Close with the RFIs most likely to turn into change events.
**Rules & Guidelines:**
* This prompt is read-only. Never call any create, update, delete, bulk, send, restore or sync tool (for example `procore-create-rfi`, `procore-update-punch-item`, `procore-delete-incident` or `procore-send-punch-item-email`).
* Report only what the tools return. Do not guess missing dates, amounts or names; mark them as missing.
* Counts come from the records returned, and `max-records` caps each call, so say when a call returned its cap and the picture may be partial.
* A cost impact value of zero or blank is not a confirmed impact; list it separately.
**Validation:**
* If the project cannot be resolved, stop and say so. Do not read records from an unresolved project.
* If the main read returns nothing, say the project has none and stop. Do not fill the gap with assumptions.
Who it's for
One answer, three teams that use it
Project managers
Forecast exposure from RFIs
See the cost the open RFIs could add up to so you can brief the owner before it is spent.
Show RFIs on Fabrikam Plaza with a cost impact over 10,000 and total them.
Contract administrators
Start change events early
Find RFIs most likely to turn into change events and read the reasoning behind them.
Which RFIs on Contoso Medical Centre are likely to become change events, and are they answered?
Cost controllers
Separate confirmed from unconfirmed
See confirmed impacts totalled apart from zero or blank values that still need a number.
List RFIs on Northwind Warehouse with a schedule impact but no cost value.
How it works
What PopdockAI does when you ask
You name the project and your AI assistant reads the RFIs and their replies. It only reads, treats zero or blank cost as not confirmed and marks any missing value as missing.
Ask
You name the project and optionally a minimum cost impact.
Pull
It resolves the project and pulls RFIs with a cost or schedule impact.
Check
It reads the question and replies behind the five largest.
Report
You get a table, the cost total and the RFIs likely to become change events.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-viewer-documents-accessible-tools
procore-get-rfis
procore-get-nested-rfis-questions
procore-get-rfis-replies
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
See potential change orders while there is time
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)