/
/
See what meetings said about a Procore RFI
For project teams who want a Procore RFI traced through Granola meeting transcripts, just by asking their AI assistant.
On this page
Connector
Connect Procore, pick your AI tool and paste the prompt.
The problem
Nobody can say what meetings said about an RFI
To learn what was said about an RFI you search many recordings for its number and subject. Even then it is hard to tell whether the talk fits the RFI's status and due date.
Without PopdockAI
- Look up the RFI's subject, status and due date in Procore
- Search each meeting recording for the number
- Try different ways the RFI was named aloud
- Piece together a timeline by hand
With PopdockAI
- The RFI is read from Procore with its status and due date
- Granola transcripts are searched for the number and subject words
- Weak matches are labelled as possible mentions
- A silent record is never reported as the RFI being ignored
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** Trace RFI number `{rfi-number}` on the Procore project matching `{project-name}` through the Granola meeting transcripts of the last `{lookback-days}` days (default 90), and show the conversation next to the RFI's current status.
**Servers:** this prompt uses tools from two servers, so both procore-project-management (Procore) and granola (Granola meeting notes) must be connected. Tools whose names start with procore are on procore-project-management; tools whose names start with granola are on granola.
**Step 1: Read the RFI in Procore**
Call `procore-get-rfis` (Procore) with `project-name.contains` = `{project-name}` and `max-records` 200. Keep the row whose `full-number` or `number` equals `{rfi-number}`. Report `subject`, `status`, `due-date`, `responsible-contractor-name`, `created-by-name`, `date-created`, `drawing-number`. If more than one project name appears, list them and stop. If no row matches, say so and stop.
**Step 2: Search the Granola transcripts**
Call `granola-get-transcript` (Granola) with `text.contains` set in turn to "RFI {rfi-number}", "RFI-{rfi-number}", "RFI #{rfi-number}", and then the two or three most distinctive words of the RFI `subject`, each with `note-created.from` = today minus `{lookback-days}` days and `max-records` 50. Keep `text`, `speaker`, `note_title`, `note_id`, `start_time`, `note_created_at`. Remove duplicate lines.
**Step 3: Add meeting context**
For each distinct `note_id` found, call `granola-get-note` (Granola) with `id` = that value, and keep `title`, `calendar_event.scheduled_start_time` and the part of `summary_text` that mentions the RFI.
**Step 4: Report**
A dated timeline: date, meeting title, speaker, excerpt of what was said. Then a short assessment: was the RFI discussed before its `due-date`, is it still open while the talk suggests it was answered or dropped, or is it never mentioned in any meeting. Quote, do not paraphrase, any stated decision.
**Rules & Guidelines:**
* `procore-get-rfis` is on Procore; `granola-get-transcript` and `granola-get-note` are on Granola.
* Read-only: do not call any Procore create, update or delete tool (for example `procore-create-meeting`, `procore-update-meeting`, `procore-create-meeting-topic`, `procore-update-meeting-topic`, `procore-create-rfi`). Granola has no write tools.
**Validation:**
* A subject-word match alone is weak evidence; label those lines "possible mention".
* If no transcript lines match, say the RFI has no recorded discussion in the period; do not suggest it was ignored.Who it's for
One answer, three teams that use it
Project managers
Answer where an RFI stands
Get a dated timeline of what was said about an RFI before you chase the answer.
Trace RFI 17 on Fabrikam Depot through Granola meetings from the last 60 days.
Contract administrators
Record what was agreed
Quote any decision stated in a meeting beside the RFI's status, for the project record.
What decisions were stated about RFI 23 on Contoso Warehouse in Granola meetings, and is it still open?
Design coordinators
Check discussion matches the status
See whether an RFI still open in Procore was described as answered or dropped in a meeting.
For RFI 31 on Northwind Plaza, was it discussed before its due date, and does Granola suggest it was answered?
How it works
What PopdockAI does when you ask
You give the RFI and project in plain words and your AI assistant reads it in Procore, then searches Granola for the conversation. It only reads and quotes stated decisions.
Ask
You give the RFI number and project, and optionally how many days to search.
Read
It reads the RFI with its subject, status, due date and responsible contractor.
Search
It looks for the RFI in the Granola transcripts and adds the meeting context for each hit.
Report
You get a dated timeline and a short assessment against the due date and status.
What PopdockAI provides
The tools behind the answer
Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.
procore-get-rfis
granola-get-transcript
granola-get-note
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
The full story of an RFI in one place
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)
