/
/
Open the Intacct project for a Procore project, once
For accountants who want an Intacct project created from a Procore project, without retyping, just by asking their AI assistant.
On this page
Connector
Connect Sage Intacct, pick your AI tool and paste the prompt.
The problem
Re-typing a project into Intacct invites typos and duplicates
A new Procore project needs a matching Intacct project before any cost can post. Keying the name and number by hand risks typos and duplicates, and nobody checks if one already exists.
Without PopdockAI
- Open the Procore project for its name and number
- Search Intacct to see if it already exists
- Retype the details into a new Intacct project
- Fix the typo or the duplicate later
With PopdockAI
- The name and accounting number come straight from Procore
- Intacct is checked by id and name, and any match stops the run
- A given customer id is verified, and no customer, manager or dates are invented
- You confirm the exact record, then it is created once and read back
The prompt
Use this prompt
Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.
**Objective:** Make sure Procore project `{project-number}` has an Intacct project, and if it has none, create one in category `{project-category}` (for customer `{customer-id}` if given) after the user confirms.
**Servers:** this prompt uses tools from two servers, so both procore-company-admin (Procore) and intacct (Intacct) must be connected. Tools whose names start with procore are on procore-company-admin; tools whose names start with intacct are on intacct.
**Step 1: Read the Procore project**
Call `procore-get-correspondence-type-items` (Procore) filtered by `project-number`, `max-records` 5. If nothing comes back, call `procore-get-generic-tools-generic-tool-items` (Procore) the same way. Take the project name and the project accounting project number. If neither tool returns the project, report that and stop.
**Step 2: Check Intacct**
Call `intacct-get-project` (Intacct) with the accounting project number as `project-id`; if there is none, with the project name as `project-name`. If a project is found, show it and stop; do not create anything. If a customer id was given, call `intacct-get-customer` (Intacct) with it as `customer-id` and stop if it does not exist.
**Step 3: Confirm, then create**
Show the user exactly what will be created: name, project id (the accounting number, or empty so Intacct assigns one), the category and the customer id if given. Ask for an explicit yes. Only after a yes, call `intacct-create-project` (Intacct) once with those values. Then call `intacct-get-project` again with the same id or name and show the stored record.
**Rules & Guidelines:**
* `intacct-create-project` is the only write tool this prompt may call, at most once, and never before the user confirms. Never call any Procore tool that creates, updates or deletes.
* Do not invent a customer, manager or dates; leave them out unless the user supplied them.
**Validation:**
* If the user declines or does not answer, make no change and say so.
* If the creation call returns an error or the follow-up read finds nothing, report it and do not retry.Who it's for
One answer, three teams that use it
Project accountants
Open projects without retyping
Create the Intacct project from the Procore record so the name and number match, and costs can post from the start.
Create an Intacct project for Procore project 24-118 in category Construction if it does not exist.
Project managers
Get a new job ready for cost
Ask for the accounting setup yourself, and see Intacct's existing project if one is already there.
Check whether Contoso Medical Centre, project number 25-007, is in Intacct, and set it up in category Healthcare if not.
Finance administrators
Keep the project list clean
Stop duplicate projects by checking id and name before anything is created, and by confirming the customer first.
Set up Procore project 24-203 in Intacct for customer CUST-1180 in category Construction, after checking it is not there.
How it works
What PopdockAI does when you ask
You give the project number and category. Your AI assistant checks Intacct first, shows you the record and creates it once, only after your yes.
Ask
You give the Procore project number, the category and, if needed, a customer id.
Check
It reads the project from Procore and checks Intacct by id and name, stopping if one exists.
Confirm
You see the name, project id, category and customer it will create and say yes.
Create
It creates the project once and reads it back to show the stored record.
What PopdockAI provides
The tools behind the answer
Ready made tools for Sage Intacct and one secure connection to your AI tool. No code, no exports.
procore-get-correspondence-type-items
procore-get-generic-tools-generic-tool-items
sage-intacct-get-project
sage-intacct-get-customer
sage-intacct-create-project
This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.
The outcome
One Intacct project per Procore project, set up right
Related use cases
More ways to put this data to work
One prompt template with infinite possibilities.
Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.
Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

.webp)
