Connectors

/

Procore

/

Review Procore punch cost impact
Report

Total the cost impact of Procore punch items

For finance and project teams who want to know what open punch items cost, by asking their AI assistant.

Try PopdockAI free
Get a live demo
Review Procore punch cost impact
Total the cost impact of punch items on Riverside Tower, only items of 500 or more, broken down by category.
Punch items of 500 or more on Riverside Tower carry a total cost impact of 84,300, with 6 items showing no amount. - Electrical: 9 items, 31,200 total, largest 7,800 - Drywall and paint: 14 items, 26,400 total, largest 4,100 - Mechanical: 5 items, 18,900 total, largest 9,500 - Largest item: Replace damaged fire damper, 9,500, open, assigned to Fabrikam Mechanical Want the top 10 items with status and assignee?
Procore
Sample figures. Your results come from your own account.
procore-get-viewer-documents-accessible-tools
procore-get-punch-items
procore-get-punch-item-types
procore-get-punch-item-templates

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Punch costs are scattered across hundreds of items

The cost impact of punch items is stored item by item, so nobody sees the total before close-out. Adding it up means exporting the list and grouping it yourself, with blank amounts left unexplained.

Without PopdockAI

  • Filter the punch list to items with a cost
  • Export it and group by category in a spreadsheet
  • Sort to find the largest items
  • Guess what to do about items with no amount

With PopdockAI

  • Costed items are read straight from the project
  • Totals by category with the largest item in each
  • The ten biggest items listed with status and assignee
  • Items with no amount counted separately, never estimated

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Total the cost impact of punch items in {project-name} at or above {min-amount} (default 0) and break it down by category.

**Step 1: Resolve the project**

Call `procore-get-viewer-documents-accessible-tools` with `project-name` equal to {project-name} to resolve the project id. If nothing matches, retry with `project-name.contains`. If more than one project matches, list them with their ids and stop and ask which one. If the user named a Procore company, pass it in the `company` parameter on every call.

**Step 2: Pull costed items**

Call `procore-get-punch-items` with the `project-id` and `cost-impact-amount.min` set to {min-amount}.

**Step 3: Add the structure**

Call `procore-get-punch-item-types` with the `project-id` to name the categories, and `procore-get-punch-item-templates` to see which items come from templates.

**Step 4: Report**

Output a table by category: item count, total cost impact, largest item. Then the top 10 items by cost impact with status and assignee. State the grand total and how many items have no amount recorded.

**Rules & Guidelines:**

* This prompt is read-only. Never call any create, update, delete, bulk, send, restore or sync tool (for example `procore-create-rfi`, `procore-update-punch-item`, `procore-delete-incident` or `procore-send-punch-item-email`).
* Report only what the tools return. Do not guess missing dates, amounts or names; mark them as missing.
* Counts come from the records returned, and `max-records` caps each call, so say when a call returned its cap and the picture may be partial.

**Validation:**

* If the project cannot be resolved, stop and say so. Do not read records from an unresolved project.
* If the main read returns nothing, say the project has none and stop. Do not fill the gap with assumptions.

Who it's for

One answer, three teams that use it

Project accountants

Put a number on punch costs

Get the total cost impact of punch items by category so the close-out forecast includes them instead of finding them in final billing.

What is the total punch item cost impact on Fabrikam Depot by category?

Project managers

Find the items that cost the most

See the ten largest costed punch items with status and assignee, so effort goes to the ones with real money attached.

Show the top 10 punch items by cost impact on Contoso Warehouse and who has them.

Owner's representatives

Check how much is still unpriced

Get a count of punch items with no amount recorded alongside the total, so you know how much of the picture is missing.

On Northwind Plaza, how many punch items have no cost recorded, and what is the total of those that do?

How it works

What PopdockAI does when you ask

You name the project and a minimum amount if you want one. Your AI assistant reads the costed punch items and totals them, reporting only the amounts Procore returns.

Ask

You name the project and, if you like, a minimum cost amount.

Your AI tool

Pull

It resolves the project and reads the punch items that have a cost impact.

procore-get-viewer-documents-accessible-tools
procore-get-punch-items
procore-get-punch-item-types
procore-get-punch-item-templates

Group

It names the categories and notes which items came from templates.

No items found.

Report

You get totals by category, the top ten items, a grand total and a count of items with no amount.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-viewer-documents-accessible-tools

Returns Procore viewer documents accessible tools records from the Project Management area. Filter by project and by the record's own fields; reads only, nothing is changed.
get-data

procore-get-punch-items

Returns Procore punch list items for a project, with status, assignee, due date and cost impact.
get-data

procore-get-punch-item-types

Returns Procore punch item types records from the Project Management area. Filter by project and by the record's own fields; reads only, nothing is changed.
get-data

procore-get-punch-item-templates

Returns Procore punch item templates records from the Project Management area. Filter by project and by the record's own fields; reads only, nothing is changed.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

Close-out cost exposure, added up before it bites

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation