Connectors

/

Procore

/

Review Procore punch list aging
Report

Find which trade is holding up Procore punch close-out

For project teams who want punch items ranked by age and lateness by vendor, by asking their AI assistant.

Try PopdockAI free
Get a live demo
Review Procore punch list aging
Age the punch list on Riverside Tower as of today and tell me which vendors have the most overdue items.
Riverside Tower has 112 punch items, 68 open and 44 closed, and 31 of the open ones are past due. - Most overdue: Fabrikam Drywall with 12 items - Next: Contoso Electrical with 8 items, Northwind Flooring with 6 - Oldest open item: Patch ceiling at Level 2 corridor, open 94 days - No due date: 5 open items, listed separately Want the full table with location and cost impact?
Procore
Sample figures. Your results come from your own account.
procore-get-viewer-documents-accessible-tools
procore-get-punch-items
procore-get-nested-punch-items-assignments
procore-get-nested-punch-items-ball-in-court

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Procore

Procore
Run it on your own Procore data.

Connect Procore, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Close-out stalls and nobody knows who is late

To see which trade is behind on punch work, you pull the list, calculate days open and overdue from the dates and match each item to its vendor. The ranking is rarely ready when the walk is.

Without PopdockAI

  • Export the punch list and open the dates
  • Work out days open and days overdue per item
  • Look up which vendor holds each open item
  • Count by vendor to see who is behind

With PopdockAI

  • Punch items and assignments are read together
  • Days open and overdue are worked out for every open item
  • Vendors ranked by overdue items, oldest items listed
  • Items with no due date listed separately, nothing edited

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Review the punch list for {project-name}, measuring age and lateness as of {as-of-date} (default today), and show what is blocking close-out.

**Step 1: Resolve the project**

Call `procore-get-viewer-documents-accessible-tools` with `project-name` equal to {project-name} to resolve the project id. If nothing matches, retry with `project-name.contains`. If more than one project matches, list them with their ids and stop and ask which one. If the user named a Procore company, pass it in the `company` parameter on every call.

**Step 2: Pull the items**

Call `procore-get-punch-items` with the `project-id`. Treat items whose status is closed as done. Compute days open from `date-created` and days overdue from `due-date`.

**Step 3: Add assignments**

Call `procore-get-nested-punch-items-assignments` and `procore-get-nested-punch-items-ball-in-court` with the `project-id` to see which party and vendor holds each open item.

**Step 4: Report**

Output a table: title, category, location, assignee vendor, status, due date, days overdue, days open, cost impact. Group by vendor with a count per vendor, rank vendors by overdue items, and list the 10 oldest open items. Give an overall open versus closed count.

**Rules & Guidelines:**

* This prompt is read-only. Never call any create, update, delete, bulk, send, restore or sync tool (for example `procore-create-rfi`, `procore-update-punch-item`, `procore-delete-incident` or `procore-send-punch-item-email`).
* Report only what the tools return. Do not guess missing dates, amounts or names; mark them as missing.
* Counts come from the records returned, and `max-records` caps each call, so say when a call returned its cap and the picture may be partial.

**Validation:**

* If the project cannot be resolved, stop and say so. Do not read records from an unresolved project.
* If the main read returns nothing, say the project has none and stop. Do not fill the gap with assumptions.

Who it's for

One answer, three teams that use it

Project managers

Chase the right trade

See vendors ranked by overdue punch items so your close-out calls go to the trade with the most outstanding.

Which vendors have the most overdue punch items on Fabrikam Depot?

Superintendents

Walk the oldest items first

Get the ten oldest open items with location and assignee, so the next walk starts where the delay is longest.

List the 10 oldest open punch items on Contoso Warehouse with their locations.

Owner's representatives

Check readiness to close

Get an open versus closed count and the number overdue, so you can judge how far the project is from handover.

Give me the open versus closed punch count for Northwind Plaza as of the end of this month.

How it works

What PopdockAI does when you ask

You name the project in plain words. Your AI assistant reads the punch list and who holds each item, then measures age and lateness and reports it.

Ask

You name the project and, if needed, the date to measure from.

Your AI tool

Pull

It resolves the project and reads the punch items, treating closed items as done.

procore-get-viewer-documents-accessible-tools
procore-get-punch-items
procore-get-nested-punch-items-assignments
procore-get-nested-punch-items-ball-in-court

Assign

It reads assignments and ball in court to see which vendor holds each open item.

No items found.

Report

You get days open and overdue per item, vendors ranked by overdue items and the ten oldest open items.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Procore and one secure connection to your AI tool. No code, no exports.

get-data

procore-get-viewer-documents-accessible-tools

Returns Procore viewer documents accessible tools records from the Project Management area. Filter by project and by the record's own fields; reads only, nothing is changed.
get-data

procore-get-punch-items

Returns Procore punch list items for a project, with status, assignee, due date and cost impact.
get-data

procore-get-nested-punch-items-assignments

Returns Procore nested punch items assignments records from the Project Management area. Filter by project and by the record's own fields; reads only, nothing is changed.
get-data

procore-get-nested-punch-items-ball-in-court

Returns Procore nested punch items ball in court records from the Project Management area. Filter by project and by the record's own fields; reads only, nothing is changed.
Read only.Nothing in Procore Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

Close-out blockers ranked by vendor

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation