Find the stale, unowned and overdue work in a Jira project

For project managers who keep putting off backlog cleanup and want the mess sorted into groups by their AI assistant.

Try PopdockAI free
Get a live demo
Audit stale Jira issues
Audit the WEB project in Jira for stale issues. Anything untouched for 21 days counts.
WEB has 64 open issues breaking at least one hygiene rule. - Untouched over 21 days: 38, oldest WEB-1042 at 140 days - No assignee: 17 - Past due: 6, worst 23 days late - In progress, no estimate: 3 One action: close or reassign the 20 oldest untouched issues. Want the tables?
Jira
Sample figures. Your results come from your own account.
jira-get-project
jira-get-issue

On this page

The problem

The problem

The prompt

Who it's for

How it works

Tools used

Connector

Jira

Jira
Run it on your own Jira data.

Connect Jira, pick your AI tool and paste the prompt.

Try PopdockAI free

The problem

Jira backlog cleanup keeps getting put off

Jira projects fill up with issues nobody has touched in weeks, open work with no owner and due dates that passed quietly. Finding them means building filters and scrolling long lists, so the cleanup keeps slipping.

Without PopdockAI

  • Build a filter for each kind of problem
  • Scroll long lists of open issues
  • Guess which mess matters most
  • Put the cleanup off another sprint

With PopdockAI

  • Every open issue in the project is swept
  • Issues fall into untouched, unassigned, past due and unestimated groups
  • Each group is sorted worst first, and a missing due date is never overdue
  • One recommended action closes the report, and nothing is changed

The prompt

Use this prompt

Copy it into any AI tool connected to PopdockAI. Swap the values in braces for your own.

Prompt
**Objective:** Audit the Jira project `{project-name}` for issues that break the hygiene rules: untouched for more than `{stale-days}` days (default 21), open with no assignee, or past due-date and not closed.

**Step 1: Resolve the project**

Call `jira-get-project` with name.contains set to {project-name}. Take its project-key. If several match, list them and stop.

**Step 2: Sweep**

Call `jira-get-issue` with project-key set to that key and max-records set to 300. Exclude issues whose status reads as Done, Closed, Resolved or Cancelled.

**Step 3: Apply the rules**

Sort every remaining issue into these buckets, an issue may land in more than one:

* **Stale** - updated-date older than {stale-days} days
* **Unowned** - assignee empty
* **Overdue** - due-date in the past
* **Unestimated** - story-points empty and the issue is In Progress

**Step 4: Report**

One section per bucket, each a table of issue-key, summary, assignee, status, updated-date, due-date, sorted worst first. Give a count per bucket. Finish with two or three sentences on which bucket is the real problem and the single action that would clear the most of it.

**Rules & Guidelines:**

* Read only. Do NOT call `jira-assign-issue`, `jira-update-issue`, `jira-add-issue-comment` or any other write tool to fix what you find. Report it.
* An empty bucket is a result. Print the heading and "none".
* Do not treat a missing due-date as overdue.

**Validation:**

* If the project has no open issues, say the project is clear and stop.
* If {stale-days} is not a number, use 21 and say so.

Who it's for

One answer, three teams that use it

Project managers

Clean up the project before planning

Get the stale, unowned and overdue work in one report, with the action that clears most of it.

Audit the MOB project in Jira for stale issues, anything untouched for 30 days.

Scrum masters

Bring real data to the retro

Show the team how much work is untouched or past due, grouped and sorted, without building filters.

How many issues in the WEB project are past due or in progress without an estimate?

Engineering managers

Find work with no owner

Open issues with no assignee are listed in their own group, ready to hand out.

Which open issues in the API project in Jira have no assignee?

How it works

What PopdockAI does when you ask

You name the Jira project and your AI assistant sorts its open work into four hygiene groups. You get a table per group and one next step, and nothing in Jira is changed.

01

Ask

You name the Jira project and optionally the stale threshold.

Your AI tool

02

Sweep

It reads every open issue in the project.

jira-get-project
jira-get-issue

03

Group

It sorts issues into untouched, unassigned, past due and in progress without an estimate.

No items found.

04

Report

You get a table per group, worst first, and one recommended action.

Your AI tool

What PopdockAI provides

The tools behind the answer

Ready made tools for Jira and one secure connection to your AI tool. No code, no exports.

get-data

jira-get-project

Returns the projects in a Jira site with their key, lead, project type, category and issue counts. Use it to resolve a project name to its key before querying issues.
get-data

jira-get-issue

Returns Jira issues with their project, issue type, status, assignee, reporter, dates and estimates. Filter by project, status, assignee or date range to pull a backlog, a sprint or one person's open work.
Read only.Nothing in Jira Changes

This report is built from Get data tools only. PopdockAI applies the row, field and parameter rules your admin sets, and every query is written to the audit trail.

How Popdock AI secures your data

The outcome

A hygiene report with one clear next step

Try PopdockAI free
Get a live demo

Related use cases

More ways to put this data to work

All Ramp use cases

One prompt template with infinite possibilities.

‍

Your AI assistant adapts its approach, tone, and capabilities to match each unique context while you maintain a single, manageable workflow.

Join forward-thinking companies that are transforming their operations with intelligent, secure AI automation.

Try PopdockAI Free
See Documentation